West Milton, Ohio, Department of Transportation Bridge – Case Study

West Milton, Ohio, Department of Transportation BridgeCase Study Project Background In November 2020, the town of West Milton, Ohio needed to quickly install optical fibers across a highway bridge to meet commitments that had been made to a property developer on the far side of the bridge and to a middle-mile service provider who wanted […]

Dyess Air Force Base, Abilene, Texas – Case Study

Dyess Air Force Base, Abilene, TexasCase Study Project Background In March 2021, following a contracted FiberTRAX and TRAXtor training session on an Air Force base in Abilene, Texas, TRAXyL was requested to install a FiberTRAX link for a desired security camera system at the base front gate. The Problem Imminent new construction at the base […]

Tyndall Air Force Base: Flightline of the Future Case Study – Panama City, Florida

Tyndall AFB Flightline of the Future

Tyndall Air Force Base, Panama City, Florida – Flightline of the Future – Case Study Project Background TRAXyL was awarded an AFWERX Challenge Contract for the Base of Future at Tyndall Air Force Base located in Panama City, Florida. Due to a massive hurricane strike, Tyndall had suffered extreme damage to existing infrastructure and was […]

Tyndall Air Force Base: Rapid Installation – Panama City, Florida

Tyndall Air Force Base: Rapid Installation – Panama City, FL

Tyndall Air Force Base: Rapid Installation – Panama City, FloridaCase Study Project Background After a previous installation on the flightline of Tyndall Air Force Base, a different unit at the base reached out to TRAXyL requesting a new installation. This installation had a time constraint and needed to be completed before a group of Air […]